Article 1. China Bridge/Civil Construction/ Civil Work /Post Tensioning and Prestressing
Article 1. China Bridge/Civil Construction/ Civil Work /Post Tensioning and Prestressing
Prestressing Projects Prestressed Construction General Process
Prestressed Materials Preparation→Prestressing Equipment Preparation→Prestressing Materials Installation→Anchor System Installation and Post Tensioning→Grouting and Sealing Anchorage.
Step 1: Prestressed Materials Preparation
Prepare Prestressed Anchorage: In China we most use 15.24mm(0.6") diameter anchorage, sometime we also use 12.7mm(0.5") anchorage. The common type used for T Type Box Girder or Cast-in-site cast-in-situ beams, etc. is Multistrands Anchorage System, Flat Anchorage System, Monostrand Anchorage, etc. The details model as followings:
PT Wedges(Three Parts PT Wedges or Two Parts PT Wedges)
Multistrands Anchorage: 2 strands to 55 strands for bridge construction such as 3 strands, 4 strands, 5 strands, 6 strands, 8 strands, 9 strands, 10 strands, 12 strands, 15 strands, 19 strands, 22 strands, etc.
Multistrands Anchorage Bearing Plate
Flat Anchorage System: 2 strands, 3 strands, 4 strands, 5 strands.
Flat Anchorage Bearing Plate
Monostrand Anchorage System: 12.7mm(0.5") or 15.24mm(0.6") anchor barrel and wedges.
PC Strand(Prestressed Strand Cable): 12.7mm(0.5") or 15.24mm(0.6") diameter
Prestressing Ducts(Corrugated Pipes):HDPE plastic ducts or galvanized and non-galvanized metal ducts
HDPE plastic ducts
Galvanized and non-galvanized metal ducts
Prestressed Round Spiral Spring Rings
Prestressed Flat Spiral Spring Rings
Contact With Us:
Jason Wang
Sales Manager
Henan Prestressing Equipment Co., Limited
Skype : jason.wang569
Email Address: sales@pt-concrete.com
Mobile & Whattsapp(wechat) No.: +8613673713569
Tel: +86-0371-63228879, Fax: +86-0371-63228879
没有评论:
发表评论